INFORMATION AVAILABILITY FOR CTE AND CTO
Thanks for reaching out. Keep in touch.
- Standard Operating procedure for Building_Plan_Approval_Residential
- Standard Operating procedure for Building_Plan_Approval_ Non Residential
- Standard Operating procedure for Compounding_Multi_Dwelling
- Standard Operating procedure for Compounding_Single_Dwelling
- Standard Operating procedure for Land_Use
- Comprehensive list of documents to be submitted as part of the application for Building Plan Approval / Consent to Establish
- Form no. 1 -Draft for application form of Building constructions development/ redevelopment
- Form no. A – Form for Specifications of proposed buildings other than Single dwelling unit
- Form no. B -Building Information Schedule
- Form no. 2 -Promise certificate for calamity safety requirement
- Form no. 3 – Committed certificate of structural engineer
- Form no. 4 -Committed certificate of structural engineer
- Form no. 5 -Indemnity bond For Basement
- Detail procedure of Inspection for CTE
- Joint Inspection Checklist for CTE
- Timeline for various verification stages of a map
- Random Allocation of Inspectors at the time of CTE
- Comprehensive list of documents to be submitted as part of the application for Occupancy Certificate / Consent to Operate
- Form no. 1 -Draft for application form of Building constructions development/ redevelopment
- Form no. A – Form for Specifications of proposed buildings other than Single dwelling unit
- Form no. B -Building Information Schedule
- Form no. 2 -Promise certificate for calamity safety requirement
- Form no. 3 – Committed certificate of structural engineer
- Form no. 4 -Committed certificate of structural engineer
- Form no. 5 -Indemnity bond For Basement
- Form no. 6 -Information of start the work of land development/ building
- Form no. 7 -Progress certificate
- Form no. 8 -Progress certificate -first floor
- Form no. 9 -Progress certificate – in case of higher building in middle floor
- Form no. 10 -Progress certificate – last floor
- Form no. 11 -Closing report
- Form no.11(A) -Building Closing certificate by Architect
- Form no. 11(B)-Building closing certificate by supervising Engineer
- Form no. 11(C) -Building Closing certificate by Structural engineer
- Detail procedure of Inspection for CTO
- Joint Inspection Checklist for CTO
- Timeline for various verification stages of a map for CTO
- Random Allocation of Inspectors at the time of CTO

